INFRASTRUCTURE-READY

Grid-compatible 2MW charging.

The BLUEWAKE ferry bypasses municipal grid bottlenecks. Our defined 2MW shore power standard delivers rapid charging without requiring costly substation upgrades.

TECHNICAL STANDARDS

Simplified route integration.

Pre-defined shore power requirements eliminate municipal planning friction and lower initial capital expenditure.

2MW Standard

Shortened Cycles

Dual Chemistry

Optimized for standard high-power port connections, eliminating the need for bespoke municipal grid overhauls.

Engineered for rapid turnaround times, matching standard passenger boarding windows to maintain strict route schedules.

Fully compatible with both modular battery banks and optional hydrogen fuel cell bunkering packages.

GRID INTEGRATION

Bypass local bottlenecks.

By capping shore power demand at 2MW, operators can deploy zero-emission transit routes immediately. This realistic threshold avoids the multi-year delays and high infrastructure costs of municipal grid expansion.

Hydrogen options increase flexibility and range

GET THE MANUAL

Ready for deployment.

Download the complete shore power integration guide, including physical deck layouts, electrical schematics, and municipal grid load profiles.